Short answer: Most Phase I prices and ranges that firms published in October 2026 put a standard commercial property at about $1,800 to $5,000, delivered in 2 to 4 weeks. The latest industry survey we found, LightBox EDR’s May 2023 benchmark, put the average at $3,083 and 16 business days. Compyle Environmental’s Phase 1 environmental site assessment is $1,495 flat for a standard-scope property, delivered in 5 business days from authorization and confirmed site access.
This guide’s figures come from prices firms publish on their own websites and from the two most recent editions of the industry’s benchmark survey, run in 2018 and 2023. What the report must contain comes from the EPA’s All Appropriate Inquiries (AAI) rule at 40 CFR Part 312 and the ASTM E1527-21 standard practice. Every competitor figure was checked on the firm’s own website on October 19, 20 or 23, 2026, and is linked.
The fee pays for a records review, a site visit, interviews and a written opinion signed by an Environmental Professional (EP). A Phase I does not sample soil or groundwater, which is a separate Phase II, or building materials, which is a separate survey. The full scope is in what is included in a Phase I.
Phase 1 ESA cost by firm, October 2026
Each firm below publishes a Phase I price or price range on its own website. Two of them, AEI and Aegis, publish a range they describe as typical for the market rather than a fee for their own work, and their rows say so.
Each page was dated 2025 or 2026 (in its text or its publication metadata) or, if undated, was live when we read it on October 19, 2026. Firms are listed alphabetically. Large national firms such as Partner Engineering and Science, EBI Consulting, Hillmann Consulting and Terracon publish no Phase I price on their service pages.
| Firm (as published on its website, October 2026) | Phase I price | Standard turnaround | Rush |
|---|---|---|---|
| A3 Environmental Consultants (A3E) (Lisle, IL) | $2,200-$4,000 for most commercial properties; office and retail near $2,200 | 3 weeks (about 12-16 business days) from authorization on its Phase I page; 2-3 weeks in its cost guide | 2 weeks for +$500; 1 week for +$1,000 (Phase I page) |
| Aegis Environmental | Says the 2024-2025 average range is $2,150-$5,000 | Says the standard timeline is 2-4 weeks | Says rush runs 1-2 weeks, typically at a 20-50% surcharge |
| AEI Consultants | Says the general range is $2,000-$5,000, with an average Phase I around $2,500 (article dated March 2025) | Says 2-4 weeks is typical | Says some firms offer rush for a fee; its own rush terms are not published |
| AOTC (Titusville, FL) | $1,800-$2,500 for standard commercial | 2-4 weeks | Not published |
| CREtelligent (Gold River, CA) | Starts around $1,800-$2,500 | Set at quote | May cost more; fee not published |
| Envicon Group (NY and NJ) | From $2,200, stated as a floor for a typical NY or NJ property | Draft in 2-3 weeks from confirmed site access in its price table; 10 business days from authorization in its page header and FAQ | 1-week priority; fee not published |
| FastPhase1 (marketplace) | From $2,950, plus published add-ons | 10 days after the site visit | Not published |
| Geotill (Fishers, IN) | $1,900 flat, nationwide | 2-3 weeks from order date | 5-7 business days; fee not published |
| iSi Environmental (Wichita, KS) | $3,500-$8,000 per site | 10-14 business days | Guaranteed 2-week turnaround available; price on request |
| RMA (Florida) | $3,500-$15,000; simple commercial $3,500-$5,000 | Not on its pricing page | Not published |
Published starting prices in the table run from about $1,800 (AOTC and CREtelligent) to $3,500 (iSi Environmental and RMA), and most published ranges top out between $2,500 and $5,000. The table is not a complete list, and some firms publish lower figures. Two that we read on October 20, 2026 are not in the table because their page text gives no date later than 2024: AAI Environmental says on its Phase I page that these reports typically cost $1,500 to $5,000 and that most commercial properties fall between $1,500 and $3,000, and Phase 1 Environmental Consulting, which serves New Jersey, New York and Pennsylvania, publishes a Phase I starting at $1,650.
“Flat” and “from” mean different things. Geotill publishes one price, while Envicon and FastPhase1 publish a floor that rises with the property.
The average cost of a Phase I environmental site assessment
The only survey data we found on average Phase I prices comes from LightBox EDR’s benchmark survey of environmental consultants. LightBox says it now runs the survey every 5 years; the two editions before 2023 were run in 2018 and 2015. We found no edition newer than 2023.
| Benchmark | Average price | Turnaround | Basis |
|---|---|---|---|
| LightBox EDR Benchmark Survey, May 2023 | $3,083 | 16 business days on average | More than 300 environmental professionals from nearly every state; an AAI Phase I on a conventional property with no non-scope issues |
| EDR Benchmark Survey, summer 2018 | $2,735 overall; $2,430 for lender clients | Most respondents reported 2-3 business weeks | Over 500 environmental professionals; a basic AAI-compliant Phase I |
| Iowa DNR brownfield program guide, 2025 | $2,000-$3,000 | Not stated | State agency handout; the year behind the figure is not stated |
The 2023 average is for a conventional property with no non-scope issues; industrial history, several parcels or an agency lender’s added scope push a quote up. Since that survey, LightBox’s Q2 2025 market snapshot has reported that Phase I pricing pressure “continues to be intense” (page 9), but it gives no average price. The starting prices in the firm table are floors, not averages, so they cannot show whether the average has moved since 2023.
What drives Phase 1 environmental site assessment cost
Two firms can quote the same property $1,000 apart because they are pricing different amounts of work, or different assumptions about it. Each driver below comes with a published example or the rule behind it.
| Driver | Why it changes the work | Published example or rule |
|---|---|---|
| Parcels and acreage | More ground to walk and more records to pull | FastPhase1 adds $150 per additional parcel and $150 for parcels over 5 acres |
| Buildings, size and age | A longer site visit and more places where chemicals may have been stored | FastPhase1 adds $99 for buildings over 50,000 sq ft and $99 for pre-1980 buildings |
| Past use | A retail, industrial or manufacturing history calls for more historical sources when they are likely to identify the specific use (EPA’s comparison of ASTM E1527-21), for example to learn whether a strip-center tenant was a dry cleaner | A3E puts office and retail near $2,200, and industrial, brownfield or former gas station sites toward $4,000 |
| Surroundings | Records for nearby sites are reviewed out to the distances the rule lists, such as 1 mile for Superfund (NPL) sites and half a mile for leaking underground tanks (40 CFR 312.26(c)) | FastPhase1 adds $199 for properties in or next to an industrial area |
| Records and data | Database and historical records packages cost money | A3E prices its database package at $375, or $415 with topographic maps |
| Lender scope | Freddie Mac requires an evaluation of asbestos, lead-based paint, drinking water quality, mold, radon and superlien status, items a standard Phase I leaves out (Guide Section 61.2(b)(2)) | Quoted per lender program |
| Delivery date | A shorter schedule is priced separately | See the rush table below |
Professional time matters too: in LightBox’s 2023 survey, report writing was the most time-consuming step, at an average of 6.8 hours. A3E also lists travel and its liability insurance among its 4 cost factors.
Phase 1 ESA cost by property type
Published prices by property type follow history and size: an office or retail building with no industrial past is the simple case, and an industrial history adds records to review and time on site. The firms below publish Phase I prices for specific property types on their own websites. We read each page on October 23, 2026.
| Property type | Compyle Environmental | Published prices (firm, page date) |
|---|---|---|
| Office and other single commercial buildings | $1,495 within standard scope | About $2,200 for a simple office, retail or warehouse property (A3E, June 2026); $2,000-$3,000 for a single commercial building (Moran Rocks, Boca Raton, FL, 2025 guide) |
| Retail | $1,495 within standard scope | $2,000-$2,800 for a single-parcel retail site with no industrial history and $2,500-$3,500 for a multi-tenant center (U.S. Commercial Building Inspections, updated August 2026); $2,500-$3,500 for retail centers (Moran Rocks); about $2,200 (A3E) |
| Warehouse | $1,495 within standard scope (not heavy industrial or manufacturing) | About $2,200 for a simple warehouse (A3E) |
| Industrial | $1,495 within standard scope; a fixed quote first for heavy industrial or manufacturing | Toward $4,000 for industrial and brownfield sites (A3E); $2,500-$3,500 for small industrial and $3,500-$6,000 for a large industrial site or former manufacturing (U.S. Commercial Building Inspections); $3,000-$4,500 for industrial facilities (Moran Rocks) |
| Agricultural land | $1,495 for one parcel up to 5 acres; larger acreage is quoted first | $2,500-$4,000 for agricultural land (Moran Rocks, 2025 guide) |
No firm we found lists a separate Phase I price for multifamily property or vacant land in a published price table. Moran Rocks’ online estimator, for Florida properties only, gives a preliminary range that changes with the property’s past use, including separate choices for undeveloped land and multifamily housing. Ours is $1,495 for either within standard scope. Agency multifamily loans add scope that a standard Phase I leaves out (see Lender scope under what drives cost), so ask for those items to be quoted with the Phase I.
Our price follows scope, not the property type label. A standard-scope property is $1,495 flat: one parcel, up to 5 acres, up to 3 buildings and 50,000 square feet in total, and a current use that is not heavy industrial or manufacturing. Multiple parcels, including contiguous parcels under one owner, need a scope review, and every property outside standard scope gets a fixed quote before you authorize.
Does a Phase I cost more in California or New York?
No survey we found measures Phase I prices by state. LightBox said in 2023 that it would analyze how pricing varies by region; we could not find that analysis in October 2026. Online guides that publish state multipliers do not publish the data or method behind them. What firms publish for their own regions is more useful:
| Region | Published price | Page date |
|---|---|---|
| Southern California | U.S. Commercial Building Inspections: $2,000-$3,500 for a typical commercial property, $2,000-$2,800 for a single-parcel retail site with no industrial history | August 2026 |
| New York and New Jersey | Envicon Group: from $2,200; Phase Enviro says New York prices typically run $1,900-$6,000 | 2026; undated |
| Florida | AOTC: $1,800-$2,500 for standard commercial; RMA: $3,500-$5,000 for simple commercial | June 2026; undated |
In these published figures, prices differ more by firm than by state: two Florida firms start at $1,800 and $3,500, while the California and New York floors sit between them. The clearest location cost is travel, which A3E says rural and out-of-state sites add.
A Phase I “near me” matters for one part of the job. The site visit must happen at the property (40 CFR 312.27); records research and report writing can be done anywhere. Compyle Environmental books a qualified local field professional for the site visit and charges the same $1,495 nationwide for standard-scope properties.
Rush fees: what a faster Phase I costs
In LightBox’s 2023 survey, 25% of responding consultants said they charge a premium for faster delivery. These firms publish rush terms (Aegis describes typical market terms rather than its own fee):
| Firm (as published, October 2026) | Standard | Rush | Rush fee |
|---|---|---|---|
| A3 Environmental | 3 weeks | 2 weeks, or 1 week | +$500, or +$1,000 |
| Aegis Environmental | 2-4 weeks | 1-2 weeks | Typically 20-50% |
| Geotill | 2-3 weeks | 5-7 business days | Applies; not published |
Our rush Phase I is 3 business days for $400 more than the $1,495 standard. Details are on our 3-business-day rush Phase I page.
A rush fee buys the consultant’s time, not anyone else’s. The site visit cannot happen until someone gives the field professional access to the property, which is why our clock runs from authorization and confirmed site access. Agency file requests run on each agency’s schedule; Curren Environmental tells clients to budget 4 to 6 weeks when agency files must be reviewed. The day-by-day picture is in how long a Phase I takes.
What a Phase I quote should include, and the usual add-ons
Two Phase I prices can be compared only when each quote states:
- The property basis (parcels, acreage, buildings, square footage, current use) and the standard (ASTM E1527-21 and 40 CFR Part 312).
- The delivery date, and the event that starts the clock.
- Who may rely on the report: you, your lender and, for U.S. Small Business Administration (SBA) loans, the Appendix 5 SBA environmental reliance letter.
- Whether the search for environmental liens and activity and use limitations is included. ASTM E1527-21 makes it the user’s job unless the consultant is hired to do it.
- What would add fees after you authorize, and the payment terms, including any deposit.
| Add-on | When you need it | Published prices |
|---|---|---|
| A named vendor’s radius report (such as EDR or ERIS) | Your lender requires a specific data vendor | Ours: $200, passed through |
| Reliance for another party | A second lender, an investor or a later buyer | Usually free at engagement and $500-$1,500 per party added later (Moraine CRE, May 2026), or 10-20% of the original fee (Lender Consulting Services). Ours: your lender and the SBA letter at no charge, $99 per added party |
| Asbestos, lead-based paint, radon, mold, wetlands or a vapor encroachment screen | Renovation, agency multifamily loans or lender policy | Priced separately; Geotill, for example, lists vapor encroachment screening, wetlands and asbestos surveys at additional cost. Ours: asbestos from $950, lead-based paint from $750, radon from $79 per unit |
Phase II ESA cost
A Phase II is a separate investigation that samples soil, groundwater or soil vapor. It usually follows when the Phase I identifies a recognized environmental condition (REC) that you or your lender want tested, and it is scoped to that concern and priced after the Phase I. Under ASTM E1527-21, a REC means hazardous substances or petroleum products present at the property because of a release, likely present because of a release or likely release, or present under conditions that pose a material threat of a future release.
On SBA loans, a property with current or past on-site dry cleaning that used, or likely used, chlorinated or petroleum-based solvents needs a Phase II after the Phase I, whatever the Phase I finds, unless SBA grants an exception to policy. That Phase II must address soil, groundwater and soil vapor, and it must be performed by an independent Environmental Professional who holds a current Professional Engineer or Professional Geologist license and has the equivalent of 3 years of full-time relevant experience (SOP 50 10 8.1, Section A, Chapter 5, Paragraph E.6.b).
Published Phase II figures depend on the number of samples, the media tested and the size of the site:
| Firm (as published on its website, October 2026) | Phase II price |
|---|---|
| AEI Consultants | A general range of $5,000-$50,000; large or highly contaminated sites may exceed $100,000 (March 2025) |
| iSi Environmental | $15,000-$50,000 or more, depending on sampling scope |
| U.S. Commercial Building Inspections (Southern California) | Soil and soil vapor sampling on a modest site typically starts around $5,000-$8,000; groundwater monitoring wells, a larger sampling grid or an indoor air study can push a Phase II to $15,000-$25,000 or more (August 2026) |
Budget for the possibility: in EDR’s 2018 survey, consultants estimated that close to one quarter of Phase I reports lead to a Phase II. When a Phase I calls for one, our Phase II ESA coordination scopes the investigation from the Phase I findings and obtains fixed bids from licensed partners, who perform the fieldwork under their own agreements, so you keep one point of contact.
Is a $1,495 Phase I too cheap? What to check
It is a fair worry. A Phase I is only as good as the inquiry behind it, and a report that costs less because it does less may not meet the All Appropriate Inquiries rule or satisfy your lender. Some consultants warn that reports under $2,000 often give up depth and accuracy (CORE Environmental), or that choosing a consultant under $3,000 could increase risk (SCS Engineers). Yet three firms in the firm table above publish prices that start below $2,000, so price alone tells you little. Use these checks, in this order, on any firm’s proposal or sample report, ours included. What our $1,495 includes follows the table.
| Check | What to look for | Rule |
|---|---|---|
| Who signs, and on what basis | An EP who meets one of 4 routes: a Professional Engineer or Professional Geologist license, or a government license or certification to perform environmental inquiries, plus 3 years of relevant experience; a science or engineering degree plus 5 years; or 10 years of full-time relevant experience. The report must state the EP’s qualifications | 40 CFR 312.10(b), 312.21(a) and 312.21(c)(3) |
| The two declarations | Signed statements that the EP meets that definition, and that the EP has the specific qualifications to assess a property of this nature, history and setting and performed the inquiry in conformance with Part 312 | 40 CFR 312.21(d) |
| Who visits the site | An on-site inspection and a view of adjoining properties, plus interviews with the current owner and occupant. Someone who is not an EP may make the visit only under the EP’s supervision or responsible charge, so ask who goes and who supervises them. If someone other than the EP made the visit or did the interviews, the report’s appendix must give that person’s qualifications | 40 CFR 312.10(b), 312.27 and 312.23; ASTM E1527-21, Section 12.15 |
| When the clock starts | The event that starts the delivery date: the order, authorization, confirmed site access or the site visit. In the report, the dates of the interviews, records review, site visit and EP declaration, so you can check the 180-day rule, which runs from those dates rather than the report date | The proposal for delivery; ASTM E1527-21, Sections 4.6.1 and 4.6.3, for the component dates |
| Scope limits and exclusions | The property basis the price assumes (parcels, acreage, buildings, current use); what the proposal excludes, such as sampling, asbestos, lead-based paint, radon and vapor encroachment screening; whether the environmental lien and activity and use limitation search is included; and what would add fees after you authorize | The proposal’s written scope; ASTM E1527-21 (see the quote checklist above) |
| The current standard | Performed to ASTM E1527-21 (or ASTM E2247-23 for forestland and rural property); the 2013 version of E1527 stopped satisfying AAI after February 13, 2024 | 40 CFR 312.11 |
| Government records | Records for the property and nearby sites at the AAI search distances: 1 mile for NPL sites and hazardous waste (RCRA) corrective action sites; half a mile for leaking tanks, landfills and state cleanup sites; adjoining properties for registered tanks and hazardous waste generators. The EP may adjust them with a documented rationale | 40 CFR 312.26(c) and (d) |
| Historical sources | Uses traced to first developed use or 1940, whichever is earlier, with aerial photographs, fire insurance maps, city directories and topographic maps reviewed when reasonably ascertainable and likely to be useful | ASTM E1527-21, per EPA’s comparison |
| Site plan and photographs | A site plan of features and conditions, and photographs of conditions that indicate RECs | ASTM E1527-21, per EPA’s comparison |
| Data gaps | Missing information named with its significance; significant data gaps listed in the conclusions | 40 CFR 312.21(c)(2); ASTM E1527-21 |
| Current hazardous substances | PFOA and PFOS evaluated as hazardous substances, which they have been under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) since July 8, 2024 | 40 CFR 302.4; 89 FR 39124, effective July 8, 2024; EPA’s comparison |
| A sample report | A recent report from the same firm, ideally on a similar property, that shows each item above, so you can see what the price buys before you authorize | Not set by rule; ask before you authorize |
| Professional liability insurance | A certificate of professional liability (errors and omissions) insurance; for SBA loans the EP must carry at least $1,000,000 per claim or occurrence | SOP 50 10 8.1, Appendix 4, definition of Environmental Professional |
| The reliance letter | Your lender named; for SBA loans, the unmodified Appendix 5 letter on a Transaction Screen, Phase I or Phase II | SOP 50 10 8.1, Section A, Chapter 5, Paragraph E.3; Appendices 4 and 5 |
What our $1,495 includes
For a standard-scope property, the flat price covers:
- An environmental database report: federal, state, tribal and local records for the property and nearby sites at the 40 CFR 312.26 and ASTM search distances.
- Historical sources back to first developed use or 1940, whichever is earlier: aerial photographs, fire insurance maps, city directories and topographic maps.
- A site visit with photographs, including views of adjoining properties, by a qualified local field professional we book, under the Environmental Professional’s supervision.
- Interviews with the owner, occupants and local agencies, and a review of your User Questionnaire.
- The Environmental Professional’s review, opinion and signature, with the 312.21(d) declarations.
- Reliance for your lender and, on SBA loans, the SBA Appendix 5 reliance letter.
What is never cut. None of these is dropped or shortened to reach the price; why our Phase I costs $1,495 explains how the price stays lower.
Neither 40 CFR Part 312 nor the SBA names a data vendor; Section 312.26 sets which records are reviewed and how far out. If your lender requires a particular vendor’s report, such as EDR or ERIS, ask for it in the quote; ours is $200 more.
Who signs your report
Every Phase I we deliver is signed by Travis Debnam, Compyle Environmental’s Environmental Professional, who meets 40 CFR 312.10 through a geology degree and more than 15 years of relevant experience. He also signs the 40 CFR 312.21(d) declarations, and on SBA loans the report comes with SBA’s Appendix 5 reliance letter. His name and qualifications are in every Phase I report, so you and your lender can check them before closing.
The qualified local field professional who visits the property works under his supervision, as 312.10(b) allows; Travis alone gives the opinions and conclusions.
Who pays for a Phase 1 environmental site assessment?
No federal law says who pays; it is a term of the purchase agreement or the loan. Federal law does not require a buyer to get a Phase I at all: the AAI rule applies to persons seeking the CERCLA landowner liability protections (40 CFR 312.1(b)), ASTM E1527-21 describes use of its practice as voluntary, and lenders set their own requirements.
The buyer usually pays, because the buyer is the party that needs the inquiry. A3E’s cost guide says the buyer typically pays and that this is negotiable; AEI says the buyer, lender or investor typically pays, and sometimes the seller under a negotiated agreement. Who orders the Phase I is a separate question, and on many loans it is the lender. Live Oak Bank tells borrowers buying commercial real estate that in most cases it orders the Phase I on their behalf, and the Environmental Bankers Association tells banks writing an environmental risk policy to consider developing a list of pre-approved environmental consultants. Ask your lender whether it orders the report or accepts one you order. Two situations change the picture:
- The loan program has the lender order it. Fannie Mae requires a Phase I on each multifamily property except certain Small Mortgage Loans, and the lender must order it. Fannie Mae’s requirements (Form 4251, Sections 1.A and 1.D) say the borrower may not rely on that report and is expected to do its own diligence. Freddie Mac has the lender retain the consultant; the borrower may pay for the work but, with limited exceptions, may not retain or direct the consultant (Guide Section 61.1(b)). Ordering is not the same as paying, so ask the lender how it bills third-party reports.
- The seller already has one. A buyer can use a report prepared for someone else only if it meets the AAI rule, the buyer reviews it and completes its own inquiries, the five time-sensitive components (interviews, lien search, government records review, site visit and EP declaration) fall within 180 days before the purchase, and the rest of the inquiry is no more than one year old (40 CFR 312.20). Our Phase I validity calculator checks a report’s dates against both limits. To rely on the seller’s report, the buyer and its lender typically need a reliance letter from the consultant.
If the Phase I leads to a Phase II, who pays for the sampling is negotiated too.
Paying for the report is not the same as being protected by it. For most buyers the relevant CERCLA protection is the bona fide prospective purchaser (BFPP) defense. A Phase I carries the Environmental Professional’s share of one of its requirements, all appropriate inquiries, which EPA says cannot be performed after the purchase (EPA enforcement guidance, page 5).
The buyer must also complete its own share of all appropriate inquiries under 40 CFR 312.22 (specialized knowledge, whether the price reflects fair market value, and the lien search and commonly known information unless the consultant obtains them) and meet continuing obligations after closing, such as taking reasonable steps (42 U.S.C. 9601(40)). An environmental attorney can tell you how those duties apply to your deal.
How to compare Phase I quotes
- Put every quote on the same property basis. Same parcels, acreage, buildings and use. A “from” price is a floor, not an offer.
- Compare when each clock starts and stops. As published, Geotill counts from the order date, A3E from authorization and FastPhase1 from the site visit, while Envicon’s price table gives the time to a draft report from confirmed site access. A week is 5 business days, so 2 to 4 weeks is 10 to 20 business days.
- Line up what each price includes: lender reliance, the SBA letter if needed, any vendor database your lender requires, agency file requests and the lien search.
- Ask what happens if the report is late or your lender rejects it, then check the proposal’s written scope, or a sample report, against the checklist above.
Cheaper reports and what they cost
Not every loan needs a full Phase I. Under SBA SOP 50 10 8.1 (Section A, Chapter 5, Paragraph E.4.a), a property whose current or known prior use matches the SBA’s list of environmentally sensitive North American Industry Classification System (NAICS) codes needs a Phase I at any loan amount; for a loan over $250,000 with no match, the minimum is an Environmental Questionnaire plus a Records Search with Risk Assessment (RSRA). Our SBA NAICS lookup checks a code against that list, and our guide to SBA environmental requirements walks through each step.
| Report | What it is | When it fits | Compyle Environmental | Published elsewhere, October 2026 |
|---|---|---|---|---|
| Desktop Screen | Databases, historical sources and a written EP opinion; no site visit, no ASTM standard, cannot meet the AAI requirement for CERCLA protections, not accepted by the SBA | A first look before you commit | $199, next business day | A3E $250 (48 to 72 hours; 1/8-mile search radius); Envicon from $850 |
| RSRA environmental report | The 312.26 government records plus historical sources, rated low, elevated or high risk by an EP; SBA requires no reliance letter for it | SBA loans over $250,000 with no NAICS match | $695, 2 business days (next business day for $150 more) | Sierra Environmental Consultants from $499; Kross Inspectors $575 (web rate); A3E $850 |
| Transaction Screen assessment | A questionnaire, a site visit and a limited records review under ASTM E1528-22; does not satisfy AAI | The SBA minimum when the current owner or operator will not sign the Environmental Questionnaire; lenders that accept a screen on low-risk collateral | $795, 4 business days (3 business days for +$250) | Few firms publish one: Phase 1 Environmental, a Florida firm, from $1,200; A3E about $1,950, per its blog |
| Phase I update | Refreshes the records review, site visit, interviews and EP declaration, and reissues the report | A closing that slipped past 180 days but is within one year | $595, 4 business days, for our own reports; others quoted after review | No firm we found publishes a fee for an update within the one-year window; iSi says an updated Phase I for an older report runs $3,500-$8,000, the same as its full Phase I range |
| Added reliance party | Lets another party rely on an existing report | A new lender or an investor | $99 per added party; letter issued within 1 business day of a complete request | $500-$1,500 per party added later (Moraine CRE) |
The full Desktop Screen, RSRA or Transaction Screen fee is credited toward a Phase I on the same property ordered within 30 days. Which report your loan needs is covered in RSRA vs Transaction Screen vs Phase I.
Why our Phase I costs $1,495
Our Phase I is $1,495 flat for a standard-scope property: one parcel, up to 5 acres, up to 3 buildings and 50,000 square feet in total, and a current use that is not heavy industrial or manufacturing. Multiple parcels, including contiguous parcels under one owner, need a scope review and a fixed quote before you authorize; other properties outside standard scope get a fixed quote within 1 business hour. When we checked firms’ websites on October 19, 20 and 23, 2026, most Phase I prices and ranges they published put a standard commercial property at about $1,800 to $5,000, as the firm table near the top shows.
The price is lower because the work costs us less, not because the scope is smaller. We built proprietary internal technology that collects and organizes the regulatory and historical records the day an order is authorized, so the Environmental Professional reviews an organized record instead of assembling one. We book a qualified local field professional for the site visit at the same time.
The report follows ASTM E1527-21 and 40 CFR Part 312, includes everything listed under what our $1,495 includes, and considers potential vapor migration. Sampling belongs to a Phase II; asbestos, lead-based paint, lead in drinking water and radon surveys are separate unless ordered, and mold surveys are outside the scope.
Delivery is 5 business days from authorization and confirmed site access, or 3 business days with rush for $400 more. Some firms, Kross Inspectors among them, also publish a typical turnaround of 5 business days. We commit to a delivery date, and if we miss it for a reason within our control, we take $250 off. If noncompliance with ASTM E1527-21 or SOP 50 10 8.1 causes a lender or SBA rejection, we correct the report at no charge, or refund its fee if we cannot; our engagement terms list the exclusions.
Lenders and brokers ordering 3 or more reports a month can get 10% off under a separate master agreement. We carry professional liability insurance (Nautilus Insurance Company) with limits of $1,000,000 per claim and $1,000,000 aggregate, and general liability insurance (Technology Risk Retention Group) with a $1,000,000 aggregate limit. Our pricing page lists every product, rush option and add-on price.
Sources
- 40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries, eCFR, National Archives and Records Administration, accessed October 2026.
- 40 CFR 302.4, Hazardous substances and reportable quantities, eCFR, National Archives and Records Administration, accessed October 2026.
- Designation of Perfluorooctanoic Acid (PFOA) and Perfluorooctanesulfonic Acid (PFOS) as CERCLA Hazardous Substances, U.S. EPA, Federal Register, 89 FR 39124, May 8, 2024, accessed October 2026.
- 42 U.S.C. 9601, Definitions (CERCLA), United States Code, 2024 edition, U.S. Government Publishing Office (govinfo), accessed October 2026.
- ASTM E1527-21, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, ASTM International, accessed October 2026.
- Comparison of All Appropriate Inquiries Regulation, the ASTM E1527-13 Phase I Environmental Site Assessment Process, and ASTM E1527-21 Phase I Environmental Site Assessment Process, U.S. EPA, docket EPA-HQ-OLEM-2021-0946 (copy hosted by the Wisconsin Department of Natural Resources), accessed October 2026.
- Enforcement Discretion Guidance Regarding Statutory Criteria for Those Who May Qualify as CERCLA Bona Fide Prospective Purchasers, Contiguous Property Owners, or Innocent Landowners, U.S. EPA, July 29, 2019, accessed October 2026.
- SOP 50 10 8.1, Lender and Development Company Loan Programs with Technical Policy Updates, effective October 1, 2026 (Word document), U.S. Small Business Administration (Section A, Chapter 5, Paragraphs E.3, E.4 and E.6; Appendices 4 and 5), accessed October 2026.
- Multifamily Seller/Servicer Guide, Chapter 61, Environmental Requirements, Freddie Mac, Guide Bulletin Update 08/25/26 (Sections 61.1(b) and 61.2(b)(2)), accessed October 2026.
- Form 4251, Section 1: Phase I Environmental Site Assessments, Fannie Mae Multifamily, accessed October 2026.
- How to Speed Up Your Loan Closing Process, Live Oak Bank, August 1, 2022, accessed October 2026.
- Environmental Policy Development, Environmental Bankers Association, accessed October 2026.
- 2023 Benchmark Survey of Environmental Professionals, LightBox, August 2023, accessed October 2026.
- A Technology Retrospective: The Past-Present-Future of Phase I ESA Tools and Processes, LightBox, January 2024 (survey respondent count and 5-year cadence), accessed October 2026.
- EDR’s 2018 Benchmark Survey of Environmental Consultants: Summary of Results, EDR, fall 2018 (including the comparison with the 2015 survey), accessed October 2026.
- Q2 2025 CRE Snapshot: Phase I ESAs, LightBox, 2025 (page 9), accessed October 2026.
- Iowa Brownfield Redevelopment Program: Site Redevelopment Process, Iowa Department of Natural Resources, 2025, accessed October 2026.
- Phase 1 Environmental Site Assessment Cost: $2,200-$4,000 (2026), A3 Environmental Consultants, accessed October 2026.
- Phase 1 ESA: Nationwide, Lender-Accepted Reports, A3 Environmental Consultants, accessed October 2026.
- Environmental Record Search: 5 Proven Risk-Reduction Options, A3 Environmental Consultants, accessed October 2026.
- ESRI: Environmental Screen with (Human) Risk Interpretation, A3 Environmental Consultants, accessed October 2026.
- RSRA: Record Search with Risk Assessment, A3 Environmental Consultants, accessed October 2026.
- Transaction Screen Assessment: Cost and Turnaround (2026), A3 Environmental Consultants, accessed October 2026.
- Phase I ESA Costs and Best Practices for 2025, Aegis Environmental, accessed October 2026.
- Understanding the Differences Between Phase I and Phase II Environmental Site Assessments, AEI Consultants, March 26, 2025, accessed October 2026.
- Phase I ESA Cost: Pricing Factors and Timeline, AOTC, accessed October 2026.
- Phase I Environmental Site Assessment Cost and Pricing Factors, CREtelligent, August 2026, accessed October 2026.
- Phase 1 Environmental Site Assessment in NY and NJ, Envicon Group, accessed October 2026.
- Fast Phase I ESA: From $2,950, Site Visit + 10 Days, FastPhase1, accessed October 2026.
- Lenders, Geotill, accessed October 2026.
- Phase I Environmental Site Assessment, iSi Environmental, accessed October 2026.
- Phase I ESA Pricing: Calculator, Estimates, and Factors, RMA, accessed October 2026.
- How Much Does a Phase I ESA Cost?, U.S. Commercial Building Inspections, updated August 22, 2026, accessed October 2026.
- Phase 1 Environmental Site Assessment Cost in New York, New Jersey, Connecticut, Phase Enviro, accessed October 2026.
- Phase 1 Environmental Assessments, AAI Environmental Corp., accessed October 2026.
- Phase 1 Environmental Site Assessment NJ, NY, PA, Phase 1 Environmental Consulting NJ, accessed October 2026.
- How much does a Phase I ESA Cost, Curren Environmental, accessed October 2026.
- The Truth About Phase 1 ESA Cost: What You Must Know, CORE Environmental, June 9, 2025, accessed October 2026.
- Optimizing Phase I ESAs for Consulting Firms, SCS Engineers, January 15, 2024, accessed October 2026.
- SBA RSRA, Records Search With Risk Assessment, Kross Inspectors, accessed October 2026.
- Phase I Environmental Site Assessment, Kross Inspectors, accessed October 2026.
- Phase 1 Environmental Site Assessment Cost: A Buyer’s Guide (2026), Moraine CRE, May 19, 2026, accessed October 2026.
- Reliance Letters Due Diligence for Environmental Site Assessments, Lender Consulting Services, accessed October 2026.
- Phase 1 Environmental Site Assessment Cost: Complete 2025 Pricing Guide, Moran Rocks LLC, accessed October 2026.
- RSRA EZ-Screen Ordering Portal, Sierra Environmental Consultants, accessed October 2026.
- Environmental Services, Phase 1 Environmental (Florida), accessed October 2026.